航空资讯 · Simple Flying · 信息日期 2026-10-13
FAA 要求更换空客 A380 发动机部件
FAA 强制更换 15 个高压涡轮级间封严
来源Simple Flying
要点
- Journalist – Aaron is an aviation and travel journalist with 14 years of experience in the travel and tourism industry. His background spans airport operations, aviation infrastructure, and travel consulting, having worked with global organizations across New Zealand, Europe, and North America. Comb
- The Federal Aviation Administration (FAA) has ordered that turbine components on certain Airbus A380 engines be replaced after an uncontained failure resulted in the superjumbo aborting a takeoff. This directive was issued on October 8 and targets the 15 high-pressure turbine interstage seals which
- The airworthiness directive is in effect from October 23, with the highest urgency replacements required within 50 flight cycles or 30 days. It is estimated that the cost to replace is $528,150 per affected engine, as reported by AeroTime.
- Uncontained Failure Of An Interstage Seal
- In a report by the FAA, a recent A380 that was equipped with GP7270 engines encountered an uncontained failure of the interstage seal, forcing the double-decker to shut down its engines and abort takeoff. The directive currently does not outline which airline was involved, nor has the aircraft regis
资讯内容以来源原文为准,不构成优惠承诺。信息整理于 2026-10-13。